Question: What Is Safe Work Method Statement NSW?

A SWMS is a document that sets out the high risk construction work activities to be carried out at a workplace, the hazards arising from these activities and the measures to be put in place to control the risks.

What is the difference between a safe work method statement and a JSA?

There really isn’t any major difference – they are all tools used to manage risk. A Safe Work Method Statement (SWMS), Work Method Statement (WMS), Job Safety & Environment Analysis (JSEA) and Job Safety Analysis (JSA) are documents that describe how work is to be carried out safely.

What is the purpose of a safe work method statement?

The primary purpose of a SWMS is to help supervisors, workers and any other persons at the workplace to understand the requirements that have been established to carry out the high risk construction work in a safe and healthy manner. The SWMS: sets out the work activities in logical sequences. identifies hazards.

How often do Swms need to be reviewed NSW?

If a SWMS is revised, all versions must be kept. If a notifiable incident occurs in connection with the high-risk construction work to which the SWMS relates then the SWMS must be kept for at least 2 years from the occurrence of the notifiable incident.

What is JSA and Swms?

A JSA is a form of risk assessment tool. A JSA should be completed prior to the development of your SWMS. Tip: The hazards and control measures identified in the JSA can be used in preparing a Safe Work Method Statement of the work activity, with content transferred onto your SWMS.

What needs to be in a method statement?

A work method statement, sometimes called a “safe system of work”, is a document that details the way a work task or process is to be completed. The method statement should outline the hazards involved and include a step by step guide on how to do the job safely.

Who is responsible for safe work method statement?

Who is responsible for preparing a safe work method statement? Under the WHS Act, the obligation to prepare an SWMS is now only a requirement if you are involved in high-risk construction work. The PCBU involved in carrying out the high-risk construction must ensure that an SWMS is prepared.

How do you write a work method statement?

Begin to write your method statement, starting at the header.

  • A standard operating procedure or title.
  • A site address.
  • Your company name, address, logo and identifying details.
  • Projected start and end dates for task.
  • A description of the work to be conducted.
  • The method statement’s author and health and safety contacts.

What is the purpose of a duty statement?

A duty statement is a description of the major function, duties, and responsibilities undertaken in a specific position. It should be a detailed account of the tasks required and performed in that position.

Who should prepare Swms?

Generally this means a SWMS is prepared by the builder for their workers, or by the subcontractor for their workers and themselves. The principal contractor, builder and subcontractors should consult with each other to determine who is in the best position to prepare the SWMS.

When should a risk assessment be carried out?

The Health and Safety Executive (HSE) says risk should be assessed “every time there are new machines, substances and procedures, which could lead to new hazards.” An employer should carry out a risk assessment: whenever a new job brings in significant new hazards.

How do you fill in Swms?

0:04

5:22

Suggested clip 92 seconds

Filling in SWMS – YouTube

YouTube

Start of suggested clip

End of suggested clip

Who is responsible for workplace health and safety?

Don’t forget, employees and the self employed have important responsibilities too. It is an employer’s duty to protect the health, safety and welfare of their employees and other people who might be affected by their business. Employers must do whatever is reasonably practicable to achieve this.

What is the difference between JSA and sop?

JSA and JHA are generally same. Both are used for identification of micro level hazards for a particular job or activity and extended up to task level. SOP or Safe Operating Procedure is an Operation Control Measure for a particular type of hazard(s) arising out of an activity or process.

What is a JSA and when is it required?

When is a JSA Required. Workplace hazard identification and an assessment of those hazards should be performed before every job. A JSA is a documented risk assessment developed when employees are requested to perform a specific task.

What is the difference between a method statement and a risk assessment?

Where a risk assessment tells you what the risks are and what the control measures will be. Method statements tells you how to complete the work, and in what order. A method statement will set out the work in a logical sequence. It will explain to employees how to do the work, providing extra details.

What is a safe work method statement?

A Safe Work Method Statement (SWMS) is a document that outlines the high risk construction work activities to be carried out at a workplace, the hazards that may arise from these activities, and the measures to put in place to control the risks.

What does a method statement tell you?

A method statement is a description of how the work will be carried out safely. These documents are usually used for higher risk work, to provide information to employees about how the work should be done, and the precautions needed.

What is a method statement template?

Work Method Statement Template

This work method statement template is used to document tasks involved in a specific task, associated hazards , and its precautionary measures. Define the tasks and associated risks. Provide control measures for the identified risks. Add all involved personnel.